Atlas Pipe Piles Logo

Material Traceability

Atlas Pipe Piles provides comprehensive material traceability resources to back up the industry leading quality that goes into each section of product. Mill Test Reports (MTRs) are complemented by material tagging and ID stamping to ensure complete traceability in all steps of the pipe pile’s lifecycle.

MTRs

In the USA, each piece of piling Atlas manufactures is bar coded and has an original Mill Test Report (MTR) from the producing mill. All mill MTRs are backed by coil certificate from our suppliers, which are reviewed before the coils are shipped to our plants. This procedure ensures that the product meets the highest quality requirements. Look at the mill stencil and heat number on a pipe or the MTR and you will have probably seen Zekelman Industries - Atlas Tube piling on your project. Atlas has your back covered with the highest quality procedures.

As an added value, Zekelman Industries provides MTR documentation that includes the following:

  • Complete Heat Traceability
  • Chemical Analysis
  • Tensile Properties
  • Charpy Impact Testing

 

value added services